{"id":1648,"date":"2022-01-31T11:31:16","date_gmt":"2022-01-31T09:31:16","guid":{"rendered":"https:\/\/craftor.se\/?p=1648"},"modified":"2022-01-31T11:31:18","modified_gmt":"2022-01-31T09:31:18","slug":"malarbanan-2","status":"publish","type":"post","link":"https:\/\/craftor.se\/en\/malarbanan-2\/","title":{"rendered":"M\u00e4larbanan"},"content":{"rendered":"<p>In Solna and Sundbyberg, work is underway to upgrade M\u00e4larbanan. The railway will be expanded and commuter train stations will be improved with, among other things, an underground station in Sundbyberg. By updating M\u00e4larbanan, opportunities are created for the expansion of both housing and business. <\/p>\n\n\n\n<p>Before work on M\u00e4larbanan can begin, some preparatory work must be done. This helps Craftor in the form of electrical construction, investigation of existing cables, wiring, new production and various temporary cable removals. Our client is waterfalls. Project manager from Craftor is Fredrik Karlsson. The groundwork is carried out by Svevia on behalf of the Swedish Transport Administration.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1200\" height=\"1600\" src=\"https:\/\/media.craftor.se\/2022\/01\/IMG_0273-1200x1600.jpg\" alt=\"\" class=\"wp-image-1645\" srcset=\"https:\/\/craftor.se\/wp-content\/uploads\/2022\/01\/IMG_0273-1200x1600.jpg 1200w, https:\/\/craftor.se\/wp-content\/uploads\/2022\/01\/IMG_0273-480x640.jpg 480w, https:\/\/craftor.se\/wp-content\/uploads\/2022\/01\/IMG_0273-768x1024.jpg 768w, https:\/\/craftor.se\/wp-content\/uploads\/2022\/01\/IMG_0273-1152x1536.jpg 1152w, https:\/\/craftor.se\/wp-content\/uploads\/2022\/01\/IMG_0273-1536x2048.jpg 1536w, https:\/\/craftor.se\/wp-content\/uploads\/2022\/01\/IMG_0273-1440x1920.jpg 1440w, https:\/\/craftor.se\/wp-content\/uploads\/2022\/01\/IMG_0273-scaled.jpg 1920w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>In Solna and Sundbyberg, work is underway to upgrade M\u00e4larbanan. The railway will be expanded and commuter train stations will be improved with, among other things, an underground station in Sundbyberg. By updating M\u00e4larbanan, opportunities are created for the expansion of both housing and business. Before work on M\u00e4larbanan can begin, some preparatory work must [&hellip;]<\/p>","protected":false},"author":1,"featured_media":1646,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[29],"tags":[],"class_list":["post-1648","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-current"],"acf":[],"_links":{"self":[{"href":"https:\/\/craftor.se\/en\/wp-json\/wp\/v2\/posts\/1648","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/craftor.se\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/craftor.se\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/craftor.se\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/craftor.se\/en\/wp-json\/wp\/v2\/comments?post=1648"}],"version-history":[{"count":0,"href":"https:\/\/craftor.se\/en\/wp-json\/wp\/v2\/posts\/1648\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/craftor.se\/en\/wp-json\/wp\/v2\/media\/1646"}],"wp:attachment":[{"href":"https:\/\/craftor.se\/en\/wp-json\/wp\/v2\/media?parent=1648"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/craftor.se\/en\/wp-json\/wp\/v2\/categories?post=1648"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/craftor.se\/en\/wp-json\/wp\/v2\/tags?post=1648"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}