Craftor

In Malmö, we currently have a station project where we are renewing the switchgear and replacing two transformers with a capacity of 130/10 kV for our customer Eon.

The switchgear is from the 70s, but the building in which the station is located is an old shipyard where boats were previously built.

Our work at the station began in September 2020 and is expected to be completed in October 2021. The calculation is SEK 31 million. The station distributes electricity to the entire Västra Hamnen in Malmö, which is a large residential and industrial area today.

The work that is currently underway and remains to be done in the future is various installations indoors, it will be dug outdoors to be able to splice outgoing cables and the installation of two transformers. The voltage setting is planned for 31/5.